![]() |
|
![]() |
|
DE-CAL's WaterWorks Group has vast experience with the construction and rehabilitation of water and wastewater treatment facilities. Our highly talented team is very familiar with the specialized products and stringent performance and reliability requirements particular to the water and wastewater industry. PC-735
Detroit Water and Sewerage Department |
||||||||||||||
Elizabeth Lake Pump Station Rehabilitation Complete
renovation of an existing sanitary pumping station. Involves replacement
of (5) existing pumps, all piping, valves, and all mechanical systems.
Coordination and planning are critical since the five story underground
station must remain operational during construction Waterford Township Water Treatment Plant Increased water capacity will be provided for the township by installation of (4) additional water filters and a new well and pump. Includes installation of raw, finished, backwash water piping, and chemical treatment systems. CM-2005
Detroit Water and Sewerage Department Installation of an oxygen distribution and diffuser system into an existing aeration tank 30 ft below ground at the Detroit Waste Treatment Facility. The stainless steel piping system is installed completely in a confined space area. Springwells Water Treatment Plant Replacement of (42) filter cells, diffusers, underdrain, and media used to refine drinking water for the Detroit Water and Sewerage Department. Installation of rotary agitators in (68) cells and skimmer water supply piping. Replacement of large diameter butterfly valves (36"), rate of flow controllers, and hydraulic actuators for all (68) cells.
|
||||||||||||||||
|
|
||||||||||||||||
|
De-cal.com
© 2001 All Rights Reserved
|
||||||||||||||||