Some of our recently completed Design/Build projects are listed below:
f

Northwest Airlines DC-10 Maintenance Hangar
Previously, Northwest Airlines had to fly their DC-10 aircraft to the Minneapolis repair hanger or repair them outside. This newly constructed facility can house (2) DC-10s and (1) DC-9 for simultaneous "all-weather" repairs.


y y y y
     


Ameritech Coin Sort Facility
The new MGM Detroit casino desperately needed land for a new parking structure but was bordered by the freeway and the new IRS building. The only other option was the land under Ameritech's coin sort facility. We were asked to be part of the design/ build team that satisfied the customer and successfully relocated Ameritech's operations to another facility within a 90 day window.

Vitec/Walbro Manufacturing
This new blowmold plant now produces plastic automotive fuel tanks. We designed and installed the plumbing and piping for the complex automated systems within 120 days. Cooperation and customer satisfaction played a vital role in securing a long-term lease for our customer from this valuable tenant.

Lamb Technicon
A new 300,000 sq. ft. headquarters and plant for engineering and manufacturing of industrial automation.

Other Design/Build Projects:

  • Selfridge National Guard New Refueling Hanger
  • Fairlane Towncenter New Food Ct. Addition
  • (2) New Johnson Controls Seat Manufacturing Plants
  • New Fed Ex Distribution Facility
  • Center for Creative Studies Park Deck
  • Buske Lines Distribution Warehouse
  • McKesson Drugs Distribution Warehouse
  • Bestbuy Distribution Warehouse
  • Daimler Chrysler MOPAR Warehouse Expansion Daimler
  • Daimler Chrysler Warren Administration Bldg.
  • Daimler Chrysler Warren Pilot Bldg.
  • (3) New Parking Decks for General Motors
  • Detroit Edison Rouge Warehouse
  • View Design/ Build Capabilites

      

     

    De-cal.com © 2001 All Rights Reserved